Sign In | Join Free | My rc363.com
rc363.com
Products
Search by Category
Wholesale Marketplace
Home > HVAC Systems & Parts >

Reliable 2 Ton 63m/Min Industrial Lifts Elevators For Construction Material Dobule Cabin

Categories Construction Material Lift
Brand Name: Changlong Century
Model Number: SC200/200
Place of Origin: China
MOQ: 1 set
Payment Terms: T/T, L/C
Supply Ability: 30 set per month
Delivery Time: 7-10 days after down pament
Packaging Details: Plastic covering, 40 feet HQ container
Capacity: 2000kg or 20 persons
Speed: 63m/min Variable speed
Cage: Double cage, with operator cabinet.
Transmission: 3 Electric motors with magnetic brakes
Type: Rack and pinion type
Color: Red or custmized
Electricl sysitem: 2 system with switch to choose
Finishing: Galvanized or painted
Rack type: M8, 1508 mm
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Reliable 2 Ton 63m/Min Industrial Lifts Elevators For Construction Material Dobule Cabin


    Reliable 2 Ton compacity 63m/min dobule cabin construction material lift for construction


    Description

    • Construction material lift using the latest technology, is widely used in different construction sites. By the special structure, it can provide transporting solution even when the construction site is limited.

    • The installation and dismantling is also very easy and flexible, when one site is finished, it can be used for another construction site. Rack pinion elevator has a services life of 8 years

    • The max installation can reach 350meters.

    Detail Specifications


    Item

    Construction material lift

    Model

    SC200/200

    Rated capacity/per cage

    2000kg

    Lifting speed

    0-63m/min

    Cage size

    3.2*1.5*2.5m

    Motor power

    3*15kw

    Speed ratio

    1:10

    Invertor Power

    45 kw

    Safety device

    SAJ50-1.4

    Mast section size

    0.65*0.65*1.508m

    Max. Installation height

    350m

    Cable type

    Cable trolley

    Doorsill height

    960mm


    Performance features:


    • ​Self erecting winch hoist help mast section- can be installed without the tower crane. Multi function operation platform, with wireless calling indicator, joysticks, overload protector, very easiy to operate, more function can be added if needed. The lading door can lading to the floor, is safer and more convenient. Call buttons can be fixed to each floor, convenient for calling.

    Safety features:


    • Equieped with Upper limit and lower limit switches, keeping the Construction material lift from crashing bottom or rushing out or the top.

    • Safety device, also called anti-falling device, with Speed sensitive parachute braking system. Overload protector- Will alarm when the hoist is overloaded.

    • Magnetic brake motors. Emergency stop button. Door interlock. Power will be shut down the power if the doors are not closed properly.

    .

    Quality Reliable 2 Ton 63m/Min Industrial Lifts Elevators For Construction Material Dobule Cabin for sale
    Send your message to this supplier
     
    From:
    Enter your email please.
    To: Wuhan changlong century machinery co.,ltd
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0

    Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

    Copyright © 2009 - 2017 rc363.com. All rights reserved.